Fujitsu Noble Park
Fujitsu Noble Park is an operational data center operated by Fujitsu Australia in Noble Park North, Australia. Our footprint estimate of its power is about 4.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Fujitsu Australia |
| Facility power | 4.5 MW (range 2.2 MW to 7.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,712 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | Fujitsu Data Centre |
| Address | 5 Summit Rd |
| Coordinates | -37.94820, 145.18496 |
| Website | fujitsu.com/au/Images/Fujitsu-Data-Centre-Noble-Park-Fact-Sheet.pdf |
Power and grid
| Nearest high-voltage substation | Springvale Terminal Station, 220 kV, 4.1 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.5 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fujitsu Noble Park use?
We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.
How close is Fujitsu Noble Park to the power grid?
The nearest high-voltage substation in OpenStreetMap is Springvale Terminal Station (220 kV), about 4.1 km away.
How clean is the power for Fujitsu Noble Park?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Fujitsu Noble Park?
Fujitsu Australia.
Data centers near Noble Park North
- Telstra Clayton Data Centre 5.6 km · 5.9 MW
- Telstra InfraCo - Clayton Data Centre 5.6 km
- DXC Technology 10.2 km · 8.3 MW
- Vocus DC-MEL04 Mitcham Data Centre 14.1 km · 3.1 MW
- OMNIconnect Data Center 16.3 km
- Micron21 Data Centre 18.0 km · 0.5 MW
- Hansen Technologies DataCentreCX 18.5 km
- AAPT Richmond (Melbourne) 21.1 km · 3.9 MW
More Fujitsu Australia data centers
- Fujitsu North Ryde Australia
- Fujitsu Homebush/Sydney Olympic Park Australia
- Fujitsu Eight Mile Plains Australia
- Fujitsu Malaga Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.