Data Center Directory

Fujitsu Homebush/Sydney Olympic Park

Fujitsu Homebush/Sydney Olympic Park is an operational data center operated by Fujitsu Australia in Sydney Olympic Park, Australia. Our footprint estimate of its power is about 8.1 MW.

Key facts

StatusOperational
OperatorFujitsu Australia
Facility power8.1 MW (range 4.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,386 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asFujitsu Homebush Data Centre
Address4 Figtree Drive
Coordinates-33.84974, 151.07161
Websitefujitsu.com/au/services/data-centres

Power and grid

Nearest high-voltage substationOlympic Park Zone Substation, 132 kV, 300 m away (Ausgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRookwood Road Bulk Supply Substation, 330 kV, 5.9 km away
HV substations within 10 km26
Power plants within 50 km229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Fujitsu Homebush/Sydney Olympic Park use?

We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.

How close is Fujitsu Homebush/Sydney Olympic Park to the power grid?

The nearest high-voltage substation in OpenStreetMap is Olympic Park Zone Substation (132 kV), about 300 m away.

How clean is the power for Fujitsu Homebush/Sydney Olympic Park?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Fujitsu Homebush/Sydney Olympic Park?

Fujitsu Australia.

Data centers near Sydney Olympic Park

More Fujitsu Australia data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.