Fujitsu Homebush/Sydney Olympic Park
Fujitsu Homebush/Sydney Olympic Park is an operational data center operated by Fujitsu Australia in Sydney Olympic Park, Australia. Our footprint estimate of its power is about 8.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Fujitsu Australia |
| Facility power | 8.1 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,386 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | Fujitsu Homebush Data Centre |
| Address | 4 Figtree Drive |
| Coordinates | -33.84974, 151.07161 |
| Website | fujitsu.com/au/services/data-centres |
Power and grid
| Nearest high-voltage substation | Olympic Park Zone Substation, 132 kV, 300 m away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Rookwood Road Bulk Supply Substation, 330 kV, 5.9 km away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fujitsu Homebush/Sydney Olympic Park use?
We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.
How close is Fujitsu Homebush/Sydney Olympic Park to the power grid?
The nearest high-voltage substation in OpenStreetMap is Olympic Park Zone Substation (132 kV), about 300 m away.
How clean is the power for Fujitsu Homebush/Sydney Olympic Park?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Fujitsu Homebush/Sydney Olympic Park?
Fujitsu Australia.
Data centers near Sydney Olympic Park
- DXN Data Centre 538 m · 7.4 MW
- Equinix SY6 - Sydney (formerly Metronode Sydney 2) 2.2 km · 2 MW
- TPG Telecom data center in Newington 2.3 km · 6.4 MW
- Equinix SY9x 4.5 km · 11 MW
- AirTrunk Sydney North 8.2 km · 26 MW
- NEXTDC S2 8.7 km · 7.8 MW
- Fujitsu North Ryde 8.9 km · 14 MW
- NEXTDC S1 9.1 km · 34 MW
More Fujitsu Australia data centers
- Fujitsu North Ryde Australia
- Fujitsu Noble Park Australia
- Fujitsu Eight Mile Plains Australia
- Fujitsu Malaga Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.