Equinix SY6 - Sydney (formerly Metronode Sydney 2)
Equinix SY6 - Sydney (formerly Metronode Sydney 2) is an operational data center operated by Equinix in Silverwater, Australia. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 2 MW (range 0.8 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,005 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 16 networks, 3 internet exchanges PeeringDB. |
| Also known as | Equinix SY6 |
| Address | 8-14 Egerton St |
| Coordinates | -33.83668, 151.05328 |
| Website | equinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy6 |
Power and grid
| Nearest high-voltage substation | Homebush Bay Subtransmission Substation, 132 kV, 1.9 km away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Rookwood Road Bulk Supply Substation, 330 kV, 6.5 km away |
| HV substations within 10 km | 25 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY6 - Sydney (formerly Metronode Sydney 2) use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is Equinix SY6 - Sydney (formerly Metronode Sydney 2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Homebush Bay Subtransmission Substation (132 kV), about 1.9 km away.
How clean is the power for Equinix SY6 - Sydney (formerly Metronode Sydney 2)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix SY6 - Sydney (formerly Metronode Sydney 2)?
Equinix.
Data centers near Silverwater
- TPG Telecom data center in Newington 588 m · 6.4 MW
- DXN Data Centre 2.1 km · 7.4 MW
- Fujitsu Homebush/Sydney Olympic Park 2.2 km · 8.1 MW
- Equinix SY9x 2.3 km · 11 MW
- NEXTDC S2 8.8 km · 7.8 MW
- AirTrunk Sydney North 9.0 km · 26 MW
- Fujitsu North Ryde 9.1 km · 14 MW
- NEXTDC S1 9.2 km · 34 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.