Equinix SY6 - Sydney (formerly Metronode Sydney 2)

Equinix SY6 - Sydney (formerly Metronode Sydney 2) is an operational data center operated by Equinix in Silverwater, Australia. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2 MW (range 0.8 MW to 5.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,005 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks16 networks, 3 internet exchanges
PeeringDB.
Also known asEquinix SY6
Address8-14 Egerton St
Coordinates-33.83668, 151.05328
Websiteequinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy6

Power and grid

Nearest high-voltage substationHomebush Bay Subtransmission Substation, 132 kV, 1.9 km away (Ausgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRookwood Road Bulk Supply Substation, 330 kV, 6.5 km away
HV substations within 10 km25
Power plants within 50 km229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix SY6 - Sydney (formerly Metronode Sydney 2) use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

How close is Equinix SY6 - Sydney (formerly Metronode Sydney 2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Homebush Bay Subtransmission Substation (132 kV), about 1.9 km away.

How clean is the power for Equinix SY6 - Sydney (formerly Metronode Sydney 2)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix SY6 - Sydney (formerly Metronode Sydney 2)?

Equinix.

Data centers near Silverwater

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.