Equinix SY9x
Equinix SY9x is an operational data center operated by Equinix in Rydalmere, Australia. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,911 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.82355, 151.03471 |
| Website | equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy9x |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix SY9x use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for Equinix SY9x?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix SY9x?
Equinix.
Data centers near Rydalmere
- Equinix SY6 - Sydney (formerly Metronode Sydney 2) 2.3 km · 2 MW
- TPG Telecom data center in Newington 2.3 km · 6.4 MW
- DXN Data Centre 4.3 km · 7.4 MW
- Fujitsu Homebush/Sydney Olympic Park 4.5 km · 8.1 MW
- NEXTDC S2 9.4 km · 7.8 MW
- AWS Asia Pacific (Sydney) Region Data Centre 9.7 km · 15 MW
- Intellicentre 2 (IC2) 9.8 km · 7.2 MW
- Fujitsu North Ryde 9.9 km · 14 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.