CDC Brooklyn Campus
CDC Brooklyn Campus is an operational data center operated by CDC in Altona North, Australia. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC |
| Facility power | 15 MW (range 6 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 125,646 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | BK1 · BK2 |
| Coordinates | -37.81692, 144.84395 |
| Website | cdc.com/locations/melbourne |
Power and grid
| Nearest high-voltage substation | Brooklyn Terminal Station, 220 kV, 1.9 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Brooklyn Campus use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is CDC Brooklyn Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Brooklyn Terminal Station (220 kV), about 1.9 km away.
How clean is the power for CDC Brooklyn Campus?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates CDC Brooklyn Campus?
CDC.
Data centers near Altona North
- CDC Melbourne BK1 212 m
- Microsoft MEL05 1.3 km · 17 MW
- NEXTDC M3 2.4 km · 5.8 MW
- VicTrack data center in Newport 4.0 km · 8.3 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 6.1 km · 8.3 MW
- Equinix ME1/ME2 - Melbourne 6.3 km · 13 MW
- AirTrunk MEL1 6.4 km · 10 MW
- AirTrunk data center in Derrimut 6.6 km · 15 MW
More CDC data centers
- CDC Eastern Creek Campus EC5 Australia
- CDC Laverton Australia
- CDC Hume Datacentre 3 Australia
- CDC Data Centre HV1A New Zealand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.