AirTrunk MEL1
AirTrunk MEL1 is an operational data center operated by AirTrunk Operating in Derrimut, Australia. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | AirTrunk Operating |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,484 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Address | 176 Swann Drive, https://www.airtrunk.com/ |
| Coordinates | -37.80040, 144.77365 |
| Website | airtrunk.com |
Power and grid
| Nearest high-voltage substation | Deer Park Terminal Station, 220 kV, 4.2 km away (TransGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.9 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AirTrunk MEL1 use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is AirTrunk MEL1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Deer Park Terminal Station (220 kV), about 4.2 km away.
How clean is the power for AirTrunk MEL1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AirTrunk MEL1?
AirTrunk Operating.
Data centers near Derrimut
- AirTrunk data center in Derrimut 150 m · 15 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 1.7 km · 8.3 MW
- Digital Realty MEL11 - Melbourne 2.1 km · 3.8 MW
- Stack Infrastructure MEL01A 3.2 km · 11 MW
- Amazon Web Services 4.5 km · 14 MW
- CDC Laverton 4.6 km · 9.9 MW
- Microsoft MEL11 4.6 km · 19 MW
- CDC Melbourne BK1 6.4 km
More AirTrunk Operating data centers
- AirTrunk SYD1 Australia
- AirTrunk SGP1 Singapore
- AirTrunk HKG1 Hong Kong SAR China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.