Microsoft MEL11 is an operational data center operated by Microsoft in Truganina, Australia. Our footprint estimate of its power is about 19 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 19 MW (range 9.4 MW to 30 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,724 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Woods Road 283, 3029 |
| Coordinates | -37.80932, 144.72247 |
| Website | local.microsoft.com/blog/woods-road-datacentre-construction-overview |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 220 kV, 3.7 km away (TransGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.9 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 292 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.51 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft MEL11 use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
What chips does Microsoft MEL11 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft MEL11 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 3.7 km away.
How clean is the power for Microsoft MEL11?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Microsoft MEL11?
Microsoft.
Data centers near Truganina
- Stack Infrastructure MEL01A 2.5 km · 11 MW
- Amazon Web Services 4.3 km · 14 MW
- AirTrunk data center in Derrimut 4.5 km · 15 MW
- AirTrunk MEL1 4.6 km · 10 MW
- Digital Realty MEL11 - Melbourne 5.7 km · 3.8 MW
- CDC Laverton 5.9 km · 9.9 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 6.0 km · 8.3 MW
- CDC Melbourne BK1 10.6 km
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.