Stack Infrastructure MEL01A

Stack Infrastructure MEL01A is an operational data center operated by STACK Infrastructure in Truganina, Australia. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorSTACK Infrastructure
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,850 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asStack Infrastructure MEL01C · Stack Infrastructure MEL01B · Stack Infrastructure MEL01D
AddressPalmers Road 399, 3029
Coordinates-37.81996, 144.74764
Websitestackinfra.com/locations/asia-pacific/melbourne/mel01

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Stack Infrastructure MEL01A use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How clean is the power for Stack Infrastructure MEL01A?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Stack Infrastructure MEL01A?

STACK Infrastructure.

Data centers near Truganina

More STACK Infrastructure data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.