CDC Laverton
CDC Laverton is an operational data center operated by CDC in Laverton, Australia. Our footprint estimate of its power is about 9.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC |
| Facility power | 9.9 MW (range 4 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 82,467 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 4,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Leakes Road 20-38, 3026 |
| Coordinates | -37.84157, 144.77539 |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Laverton use?
We estimate the facility power at about 9.9 MW. Estimate from building footprint, low confidence.
How clean is the power for CDC Laverton?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates CDC Laverton?
CDC.
Data centers near Laverton
- Amazon Web Services 1.8 km · 14 MW
- Stack Infrastructure MEL01A 3.4 km · 11 MW
- AirTrunk MEL1 4.6 km · 10 MW
- AirTrunk data center in Derrimut 4.6 km · 15 MW
- Microsoft MEL11 5.9 km · 19 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 6.0 km · 8.3 MW
- CDC Melbourne BK1 6.4 km
- CDC Brooklyn Campus 6.6 km · 15 MW
More CDC data centers
- CDC Brooklyn Campus Australia
- CDC Eastern Creek Campus EC5 Australia
- CDC Hume Datacentre 3 Australia
- CDC Data Centre HV1A New Zealand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.