CDC Eastern Creek Campus EC5
CDC Eastern Creek Campus EC5 is an operational data center operated by CDC in Minchinbury, Australia. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC |
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,588 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.81829, 150.83671 |
| Website | cdcdatacentres.com.au/eastern-creek-campus |
Power and grid
| Nearest high-voltage substation | CDC Eastern Creek Substation, 132 kV, 400 m away (CDC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney West SVC, 330 kV, 700 m away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Eastern Creek Campus EC5 use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is CDC Eastern Creek Campus EC5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is CDC Eastern Creek Substation (132 kV), about 400 m away.
How clean is the power for CDC Eastern Creek Campus EC5?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates CDC Eastern Creek Campus EC5?
CDC.
Data centers near Minchinbury
- CDC Eastern Creek Campus EC4 92 m · 17 MW
- CDC Sydney EC1 174 m · 17 MW
- Data center in Minchinbury 841 m · 12 MW
- AWS Asia Pacific (Sydney) Region Data Centre 1000 m · 10 MW
- Digital Realty Sydney SYD10 3.8 km · 12 MW
- AWS Asia Pacific (Sydney) Region Data Centre 4.0 km · 14 MW
- Telstra 4.1 km · 24 MW
- AirTrunk SYD3 Sydney West 4.2 km · 11 MW
More CDC data centers
- CDC Brooklyn Campus Australia
- CDC Laverton Australia
- CDC Hume Datacentre 3 Australia
- CDC Data Centre HV1A New Zealand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.