AirTrunk SYD3 Sydney West
AirTrunk SYD3 Sydney West is a data center under construction operated by AirTrunk in Doonside, Australia. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | AirTrunk |
| Facility power | 11 MW (range 4.2 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 87,520 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Huntingwood Drive 51, 2148 |
| Coordinates | -33.79892, 150.87542 |
| Website | airtrunk.com/location/syd3-sydney-west |
Power and grid
| Nearest high-voltage substation | AirTrunk Data Centre Substation, 132 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney West SVC, 330 kV, 4.5 km away |
| HV substations within 10 km | 21 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AirTrunk SYD3 Sydney West use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is AirTrunk SYD3 Sydney West to the power grid?
The nearest high-voltage substation in OpenStreetMap is AirTrunk Data Centre Substation (132 kV), about 500 m away.
How clean is the power for AirTrunk SYD3 Sydney West?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AirTrunk SYD3 Sydney West?
AirTrunk.
Data centers near Doonside
- AirTrunk SYD1 Sydney West 525 m · 6.3 MW
- AirTrunk SYD1 572 m · 25 MW
- AWS Asia Pacific (Sydney) Region Data Centre 720 m · 14 MW
- Sydney 01 1.2 km · 9.8 MW
- AWS Asia Pacific (Sydney) Region Data Centre 3.6 km · 10 MW
- Data center in Minchinbury 3.7 km · 12 MW
- CDC Sydney EC1 4.0 km · 17 MW
- CDC Eastern Creek Campus EC4 4.1 km · 17 MW
More AirTrunk data centers
- AirTrunk Singapore SGP1 Singapore
- 2B棟 Japan
- AirTrunk Sydney North Australia
- AirTrunk data center in Derrimut Australia
- AirTrunk SYD1 Sydney West Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.