AirTrunk SYD1
AirTrunk SYD1 is a data center under construction operated by AirTrunk Operating in Huntingwood, Australia. Our footprint estimate of its power is about 25 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | AirTrunk Operating |
| Facility power | 25 MW (range 13 MW to 40 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,978 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | AirTrunk SYD1 Sydney West · AirTrunk Stage 4 |
| Address | 35 Huntingwood Drive |
| Coordinates | -33.79952, 150.88157 |
| Website | airtrunk.com |
Power and grid
| Nearest high-voltage substation | AirTrunk Data Centre Substation, 132 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney West SVC, 330 kV, 5 km away |
| HV substations within 10 km | 21 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AirTrunk SYD1 use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
How close is AirTrunk SYD1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is AirTrunk Data Centre Substation (132 kV), about 100 m away.
How clean is the power for AirTrunk SYD1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AirTrunk SYD1?
AirTrunk Operating.
Data centers near Huntingwood
- AirTrunk SYD1 Sydney West 125 m · 6.3 MW
- AirTrunk SYD3 Sydney West 572 m · 11 MW
- Sydney 01 760 m · 9.8 MW
- AWS Asia Pacific (Sydney) Region Data Centre 1.2 km · 14 MW
- AWS Asia Pacific (Sydney) Region Data Centre 4.1 km · 10 MW
- Data center in Minchinbury 4.2 km · 12 MW
- CDC Sydney EC1 4.5 km · 17 MW
- CDC Eastern Creek Campus EC4 4.6 km · 17 MW
More AirTrunk Operating data centers
- AirTrunk MEL1 Australia
- AirTrunk SGP1 Singapore
- AirTrunk HKG1 Hong Kong SAR China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.