Data Center Directory

CDC Sydney EC1

CDC Sydney EC1 is an operational data center operated by CDC Data Centres in Eastern Creek, Australia. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorCDC Data Centres
Facility power17 MW (range 8.3 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,900 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks, 1 internet exchanges
PeeringDB.
Also known asCDC Sydney EC2 · CDC Sydney EC3 · CDC Sydney EC4 · CDC Eastern Creek Campus EC3 · CDC Eastern Creek Campus EC6
Address17 Roberts Rd
Coordinates-33.81728, 150.83814
Websitecdc.com

Power and grid

Nearest high-voltage substationCDC Eastern Creek Substation, 132 kV, 300 m away (CDC)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSydney West SVC, 330 kV, 800 m away
HV substations within 10 km17
Power plants within 50 km229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CDC Sydney EC1 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is CDC Sydney EC1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is CDC Eastern Creek Substation (132 kV), about 300 m away.

How clean is the power for CDC Sydney EC1?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates CDC Sydney EC1?

CDC Data Centres.

Data centers near Eastern Creek

More CDC Data Centres data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.