CDC Sydney EC1
CDC Sydney EC1 is an operational data center operated by CDC Data Centres in Eastern Creek, Australia. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC Data Centres |
| Facility power | 17 MW (range 8.3 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,900 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | CDC Sydney EC2 · CDC Sydney EC3 · CDC Sydney EC4 · CDC Eastern Creek Campus EC3 · CDC Eastern Creek Campus EC6 |
| Address | 17 Roberts Rd |
| Coordinates | -33.81728, 150.83814 |
| Website | cdc.com |
Power and grid
| Nearest high-voltage substation | CDC Eastern Creek Substation, 132 kV, 300 m away (CDC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney West SVC, 330 kV, 800 m away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Sydney EC1 use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is CDC Sydney EC1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is CDC Eastern Creek Substation (132 kV), about 300 m away.
How clean is the power for CDC Sydney EC1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates CDC Sydney EC1?
CDC Data Centres.
Data centers near Eastern Creek
- CDC Eastern Creek Campus EC4 163 m · 17 MW
- CDC Eastern Creek Campus EC5 174 m · 14 MW
- Data center in Minchinbury 711 m · 12 MW
- AWS Asia Pacific (Sydney) Region Data Centre 868 m · 10 MW
- AWS Asia Pacific (Sydney) Region Data Centre 3.8 km · 14 MW
- Digital Realty Sydney SYD10 3.9 km · 12 MW
- AirTrunk SYD3 Sydney West 4.0 km · 11 MW
- Telstra 4.3 km · 24 MW
More CDC Data Centres data centers
- CDC Auckland HV1 New Zealand
- CDC Auckland SD1 New Zealand
- CDC Canberra FY1 Australia
- CDC Canberra HU4 Australia
- CDC Melbourne BK1 Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.