CDC Auckland HV1
CDC Auckland HV1 is an operational data center operated by CDC Data Centres in Hobsonville, Auckland, New Zealand. Our footprint estimate of its power is about 33 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDC Data Centres |
| Facility power | 33 MW (range 16 MW to 52 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,468 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 12 networks, 1 internet exchanges PeeringDB. |
| Also known as | CDC Data Centre HV1 |
| Address | 32 - 34 Westpoint Drive |
| Coordinates | -36.80303, 174.63685 |
| Website | cdc.com |
Power and grid
| Nearest high-voltage substation | Henderson Substation, 220 kV, 4.6 km away (Transpower New Zealand) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 12 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 96 g CO₂ per kWh (New Zealand, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 53.7%, other renewables 22%, wind 9.5%, gas 8.6%, solar 1.8%. Clean power: 88.2% |
Climate and water
| Average temperature | 16.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.1 °C (2001 to 2025) |
| Cooling degree days | 170 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.29 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low (<10%) (Auckland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDC Auckland HV1 use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
How close is CDC Auckland HV1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Henderson Substation (220 kV), about 4.6 km away.
How clean is the power for CDC Auckland HV1?
The grid in New Zealand emits about 96 g CO₂ per kWh (2025). Largest sources: hydro 53.7%, other renewables 22%, wind 9.5%.
Who operates CDC Auckland HV1?
CDC Data Centres.
Data centers near Hobsonville, Auckland
- CDC Data Centre HV1A 83 m · 4.5 MW
- GCSB Data Centre 2.1 km · 12 MW
- Microsoft Data Centre 3.3 km · 38 MW
- DCI Data Centre 3.5 km · 3.9 MW
- Amazon Web Services Data Centre 3.5 km · 4.8 MW
- Chorus Massey Exchange (MSY) 5.7 km
- Chorus data center in Kumeu 7.5 km
- 2degrees Auckland - Albany 7.9 km · 6.3 MW
More CDC Data Centres data centers
- CDC Sydney EC1 Australia
- CDC Auckland SD1 New Zealand
- CDC Canberra FY1 Australia
- CDC Canberra HU4 Australia
- CDC Melbourne BK1 Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.