Data Center Directory

Chorus Massey Exchange (MSY)

Chorus Massey Exchange (MSY) is an operational data center operated by Chorus New Zealand in Waitakere City, New Zealand. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorChorus New Zealand
Address142-144 Don Buck Rd, Massey
Coordinates-36.84984, 174.60950
Websitesp.chorus.co.nz/product/exchange-space/overview

Power and grid

Nearest high-voltage substationHenderson Substation, 220 kV, 1.2 km away (Transpower New Zealand)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
Power plants within 50 km12 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity96 g CO₂ per kWh (New Zealand, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 53.7%, other renewables 22%, wind 9.5%, gas 8.6%, solar 1.8%. Clean power: 88.2%

Climate and water

Average temperature16.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature26.1 °C (2001 to 2025)
Cooling degree days170 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m7.8 m/s average
Water stress todayLow (<10%) (Auckland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Chorus Massey Exchange (MSY) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Henderson Substation (220 kV), about 1.2 km away.

How clean is the power for Chorus Massey Exchange (MSY)?

The grid in New Zealand emits about 96 g CO₂ per kWh (2025). Largest sources: hydro 53.7%, other renewables 22%, wind 9.5%.

Who operates Chorus Massey Exchange (MSY)?

Chorus New Zealand.

Data centers near Waitakere City

More Chorus New Zealand data centers

Sources

Correct this page or get the data