Microsoft Data Centre
Microsoft Data Centre is an operational data center operated by Microsoft in West Harbour, New Zealand. Our footprint estimate of its power is about 38 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 38 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,265 m² building outline x 5 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -36.81408, 174.60212 |
Power and grid
| Grid carbon intensity | 96 g CO₂ per kWh (New Zealand, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 53.7%, other renewables 22%, wind 9.5%, gas 8.6%, solar 1.8%. Clean power: 88.2% |
Climate and water
| Average temperature | 16.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.1 °C (2001 to 2025) |
| Cooling degree days | 170 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.29 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low (<10%) (Auckland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Data Centre use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Data Centre use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft Data Centre?
The grid in New Zealand emits about 96 g CO₂ per kWh (2025). Largest sources: hydro 53.7%, other renewables 22%, wind 9.5%.
Who operates Microsoft Data Centre?
Microsoft.
Data centers near West Harbour
- DCI Data Centre 213 m · 3.9 MW
- Amazon Web Services Data Centre 356 m · 4.8 MW
- GCSB Data Centre 3.1 km · 12 MW
- CDC Data Centre HV1A 3.2 km · 4.5 MW
- CDC Auckland HV1 3.3 km · 33 MW
- Chorus Massey Exchange (MSY) 4.0 km
- Chorus data center in Kumeu 5.7 km
- 2degrees Auckland - Albany 11.0 km · 6.3 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.