AAPT Fortitude Valley
AAPT Fortitude Valley is an operational data center operated by Vocus in Brisbane, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Vocus |
| Networks | 9 networks, 1 internet exchanges PeeringDB. |
| Also known as | Over the Wire - 100 Wickham |
| Address | Level 1, 100 Wickham Street, Fortitude Valley |
| Coordinates | -27.45965, 153.03099 |
| Website | appt.com.au |
Power and grid
| Nearest high-voltage substation | McLachlan Street substation, 110 kV, 500 m away (Energex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Murarrie Substation, 275 kV, 8.2 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 960 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 21.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 1,318 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is AAPT Fortitude Valley to the power grid?
The nearest high-voltage substation in OpenStreetMap is McLachlan Street substation (110 kV), about 500 m away.
How clean is the power for AAPT Fortitude Valley?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AAPT Fortitude Valley?
Vocus.
Data centers near Brisbane
More Vocus data centers
- AAPT Richmond (Melbourne) Australia
- PIPE Networks Melbourne Australia
- Soul DataCentre Australia
- TransACT Telehouse Australia
- AAPT Adelaide Australia
- AAPT Brisbane Australia