Equinix BR1 - Brisbane (formerly Metronode Brisbane 1)
Equinix BR1 - Brisbane (formerly Metronode Brisbane 1) is an operational data center operated by Equinix in Brisbane, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 21 networks, 1 internet exchanges PeeringDB. |
| Address | 54-58 Alfred Street, Fortitude Valley |
| Coordinates | -27.45519, 153.03407 |
| Website | equinix.com/locations/australia-colocation/brisbane-data-centers |
Power and grid
| Nearest high-voltage substation | McLachlan Street substation, 110 kV, 400 m away (Energex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Murarrie Substation, 275 kV, 7.9 km away |
| HV substations within 10 km | 18 |
| Power plants within 50 km | 960 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 21.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 1,318 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix BR1 - Brisbane (formerly Metronode Brisbane 1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is McLachlan Street substation (110 kV), about 400 m away.
How clean is the power for Equinix BR1 - Brisbane (formerly Metronode Brisbane 1)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix BR1 - Brisbane (formerly Metronode Brisbane 1)?
Equinix.
Data centers near Brisbane
- NEXTDC B2 166 m
- Over the Wire - 360 St Pauls 185 m
- 5GN Brisbane Data Centre (BDC) 237 m
- AAPT Fortitude Valley 582 m
- Christie Systems DC1 1.2 km
- NEXTDC B1 1.2 km
- Over the Wire - 24 Little Edward 1.3 km
- PIPE Networks Brisbane 1.3 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.