Equinix CA1 - Canberra is an operational data center operated by Equinix in Mitchell, Australia. Our footprint estimate of its power is about 5.8 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power5.8 MW (range 2.9 MW to 9.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,409 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks, 2 internet exchanges
PeeringDB.
Also known asEquinix CA1
Address51 Dacre Street
Coordinates-35.20850, 149.13536
Websiteequinix.com/locations/asia-colocation/australia-colocation/canberra-data-centers/ca1

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days433 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.92 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayMedium - High (20-40%) (Australian Capital Territory)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix CA1 - Canberra use?

We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.

How clean is the power for Equinix CA1 - Canberra?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix CA1 - Canberra?

Equinix.

Data centers near Mitchell

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.