DCA | Pier DC Tier III
DCA | Pier DC Tier III is an operational data center operated by DC Alliance in Perth, Australia. Our footprint estimate of its power is about 7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DC Alliance |
| Facility power | 7 MW (range 3.5 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,866 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | Pier Data Centre |
| Address | 1 Martin Place, Canning Vale |
| Coordinates | -32.05965, 115.91607 |
| Website | dcalliance.com.au |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 1.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 330 kV, 7.8 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.6 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 17.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 914 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.6 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Medium - High (20-40%) (Western Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DCA | Pier DC Tier III use?
We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.
How close is DCA | Pier DC Tier III to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.3 km away.
How clean is the power for DCA | Pier DC Tier III?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates DCA | Pier DC Tier III?
DC Alliance.
Data centers near Perth
- Data center in East Victoria Park 7.5 km · 2.8 MW
- Pawsey Supercomputing Centre Setonix 8.0 km · 0.8 MW
- Telstra 10.8 km
- PureColo PER01 (Perth) 11.8 km
- aCure 12.7 km
- Equinix PE1 - Perth 12.8 km
- Vocus Perth PER01 12.9 km
- NEXTDC P2 13.0 km · 48 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.