Data Center Directory

Delska EU North Vilnius LT DC1

Delska EU North Vilnius LT DC1 is an operational data center operated by Delska Lithuania in Vilnius, Lithuania. Our footprint estimate of its power is about 18 MW.

Key facts

StatusOperational
OperatorDelska Lithuania
Facility power18 MW (range 8.9 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,750 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks, 1 internet exchanges
PeeringDB.
AddressJ. Tiskeviciaus street 72, Vilnius, 02231, Lithuania
Coordinates54.61156, 25.12089
Websitedelska.com/data-centers

Power and grid

Nearest high-voltage substationVilniaus TP, 330 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km14
Power plants within 50 km1.5 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity138 g CO₂ per kWh (Lithuania, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 45%, solar 18.7%, gas 16.4%, bioenergy 10.2%, oil and other fossil 5.9%. Clean power: 77.7%
Industrial power priceEUR 0.112 per kWh (Lithuania, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature6.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.1 °C (2001 to 2025)
Cooling degree days88 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.86 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayMedium - High (20-40%) (Lithuania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Delska EU North Vilnius LT DC1 use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.

How close is Delska EU North Vilnius LT DC1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Vilniaus TP (330 kV), about 300 m away.

How clean is the power for Delska EU North Vilnius LT DC1?

The grid in Lithuania emits about 138 g CO₂ per kWh (2025). Largest sources: wind 45%, solar 18.7%, gas 16.4%.

Who operates Delska EU North Vilnius LT DC1?

Delska Lithuania.

Data centers near Vilnius

More Delska Lithuania data centers

Sources

Correct this page or get the data