DFW2-DC1 Project is a data center under construction in Wilmer, United States. Our footprint estimate of its power is about 126 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power126 MW (range 50 MW to 315 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,051,379 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 54,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest Belt Line Road 782, 75172, Wilmer
Coordinates32.58220, -96.69559
Websitestreamdatacenters.com/locations/dallas-data-centers

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 900 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 345 kV, 3.9 km away
HV substations within 10 km10
UtilityHilco Electric Cooperative, INC. (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineAtmos Pipeline - Texas, intrastate pipeline, 6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km6.5 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.5 °C (2001 to 2025)
Cooling degree days1,569 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.71 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DFW2-DC1 Project use?

We estimate the facility power at about 126 MW. Estimate from building footprint, low confidence.

How close is DFW2-DC1 Project to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 900 m away. The local utility is Hilco Electric Cooperative, INC., in the ERCO balancing area.

How clean is the power for DFW2-DC1 Project?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.