DFW2-DC1 Project is a data center under construction in Wilmer, United States. Our footprint estimate of its power is about 126 MW.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Facility power | 126 MW (range 50 MW to 315 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,051,379 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 54,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West Belt Line Road 782, 75172, Wilmer |
| Coordinates | 32.58220, -96.69559 |
| Website | streamdatacenters.com/locations/dallas-data-centers |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 900 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 3.9 km away |
| HV substations within 10 km | 10 |
| Utility | Hilco Electric Cooperative, INC. (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.5 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,569 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.71 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DFW2-DC1 Project use?
We estimate the facility power at about 126 MW. Estimate from building footprint, low confidence.
How close is DFW2-DC1 Project to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 900 m away. The local utility is Hilco Electric Cooperative, INC., in the ERCO balancing area.
How clean is the power for DFW2-DC1 Project?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Wilmer
- Data center in Lancaster 3.6 km · 63 MW
- Compass Data Center 9.7 km · 39 MW
- Compass Data Center 10.1 km · 39 MW
- Compass Data Center 10.2 km · 39 MW
- Google 10.3 km · 27 MW
- Google Red Oak 10.7 km · 93 MW
- Compass Data Center 10.8 km · 39 MW
- Compass Data Center 11.0 km · 39 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.