DNSnetworks IDC1
DNSnetworks IDC1 is an operational data center operated by DNSnetworks in Ottawa, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | DNSnetworks |
| Also known as | Qu Datacentres - Baseline |
| Address | 2934 Baseline Rd |
| Coordinates | 45.33619, -75.79721 |
| Website | dnsnetworks.com |
Power and grid
| Nearest high-voltage substation | Manordale MTS, 115 kV, 1.8 km away (Hydro Ottawa) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Merivale TS, 500 kV, 5 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 959 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 5.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.9 °C (2001 to 2025) |
| Cooling degree days | 220 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.6 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is DNSnetworks IDC1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Manordale MTS (115 kV), about 1.8 km away.
How clean is the power for DNSnetworks IDC1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates DNSnetworks IDC1?
DNSnetworks.
Data centers near Ottawa
- PureColo OTT02 (Ottawa DC2) 8.4 km
- PureColo OTT01 (Ottawa DC1) 8.8 km
- Equinix OT1 - Ottawa 40.9 km · 5.8 MW