Equinix OT1 - Ottawa
Equinix OT1 - Ottawa is an operational data center operated by Equinix in Gatineau, Canada. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 5.8 MW (range 2.9 MW to 9.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,837 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix OT1 |
| Address | 200 Avenue Lépine |
| Coordinates | 45.57535, -75.39812 |
| Website | equinix.com/locations/americas-colocation/canada-colocation/ottawa-data-centers/ot1 |
Power and grid
| Nearest high-voltage substation | Poste de Buckingham, 120 kV, 600 m away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Poste Masson, 230 kV, 3.9 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 874 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 5.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36 °C (2001 to 2025) |
| Cooling degree days | 196 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.6 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix OT1 - Ottawa use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
How close is Equinix OT1 - Ottawa to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste de Buckingham (120 kV), about 600 m away.
How clean is the power for Equinix OT1 - Ottawa?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Equinix OT1 - Ottawa?
Equinix.
Data centers near Gatineau
- PureColo OTT02 (Ottawa DC2) 34.6 km
- DNSnetworks IDC1 40.9 km
- PureColo OTT01 (Ottawa DC1) 47.7 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.