Data Center Directory

Equinix OT1 - Ottawa

Equinix OT1 - Ottawa is an operational data center operated by Equinix in Gatineau, Canada. Our footprint estimate of its power is about 5.8 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power5.8 MW (range 2.9 MW to 9.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,837 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asEquinix OT1
Address200 Avenue Lépine
Coordinates45.57535, -75.39812
Websiteequinix.com/locations/americas-colocation/canada-colocation/ottawa-data-centers/ot1

Power and grid

Nearest high-voltage substationPoste de Buckingham, 120 kV, 600 m away (Hydro-Québec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPoste Masson, 230 kV, 3.9 km away
HV substations within 10 km9
Power plants within 50 km874 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature5.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36 °C (2001 to 2025)
Cooling degree days196 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.6 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow - Medium (10-20%) (Canada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix OT1 - Ottawa use?

We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.

How close is Equinix OT1 - Ottawa to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste de Buckingham (120 kV), about 600 m away.

How clean is the power for Equinix OT1 - Ottawa?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Equinix OT1 - Ottawa?

Equinix.

Data centers near Gatineau

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.