포스코DX 충주클라우드데이터센터
포스코DX 충주클라우드데이터센터 is an operational data center in Chungju, South Korea. Our footprint estimate of its power is about 4.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.8 MW (range 2.4 MW to 7.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,988 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.00287, 127.81712 |
Power and grid
| Grid carbon intensity | 418 g CO₂ per kWh (South Korea, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 31.1%, nuclear 29.4%, gas 28%, solar 6%, bioenergy 3.2%. Clean power: 39.9% |
Climate and water
| Water stress today | Medium - High (20-40%) (South Korea) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 포스코DX 충주클라우드데이터센터 use?
We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.
How clean is the power for 포스코DX 충주클라우드데이터센터?
The grid in South Korea emits about 418 g CO₂ per kWh (2025). Largest sources: coal 31.1%, nuclear 29.4%, gas 28%.
Data centers near Chungju
- 각 세종 69.5 km · 46 MW
- Jukjeon Data center 70.6 km
- Lotte Yongin 71.0 km
- SKbroadbandidc 72.7 km
- kt cloud Bundang 73.0 km
- KINX Bundang 76.5 km
- 전상동 82.0 km · 29 MW
- KR1 강남데이터센터 85.6 km · 20 MW
Sources
Correct this page or get the data