EcoDataCenter is a data center under construction in Borlänge, Sweden. Our footprint estimate of its power is about 97 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power97 MW (range 39 MW to 242 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 807,650 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 41,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates60.52177, 15.42052

Power and grid

Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature4.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.1 °C (2001 to 2025)
Cooling degree days23 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow (<10%) (Dalarna)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does EcoDataCenter use?

We estimate the facility power at about 97 MW. Estimate from building footprint, low confidence.

How clean is the power for EcoDataCenter?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.