Data Center Directory

EdgeCore AS02

EdgeCore AS02 is an operational data center operated by EdgeCore in Sterling, United States. Its power is about 55 MW.

Key facts

StatusOperational
OperatorEdgeCore
Facility power55 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power42 MW
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSous Vide Lane 22425, Sterling
Coordinates38.99507, -77.44598
Websiteedgecore.com/locations/ashburn-data-center

Power and grid

UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 800 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does EdgeCore AS02 use?

Public data puts the facility power at about 55 MW. Derived from a tagged IT power value.

How clean is the power for EdgeCore AS02?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates EdgeCore AS02?

EdgeCore.

Data centers near Sterling

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.