ELN02
ELN02 is an operational data center operated by Applied Digital in Ellendale, United States. Our footprint estimate of its power is about 29 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Applied Digital |
| Facility power | 29 MW (range 12 MW to 72 MW) Estimate from building footprint, low confidence. Footprint estimate: about 241,050 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Applied Digital / Ellendale Data Center |
| Address | 9663 87th Avenue SE |
| Coordinates | 46.01282, -98.56988 |
| Website | applieddigital.com |
Power and grid
| Utility | Dakota Valley Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Grid carbon intensity | 539 g CO₂ per kWh (North Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5% |
| Industrial power price | USD 0.081 per kWh (North Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.9 °C (2001 to 2025) |
| Cooling degree days | 379 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (North Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ELN02 use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
What chips does ELN02 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How clean is the power for ELN02?
The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.
Who operates ELN02?
Applied Digital.
Data centers near Ellendale
- Data center in Aberdeen 158 m · 5.2 MW
- CoreWeave Ellendale ND 299 m · 88 MW
- Data center in Aberdeen 302 m · 7.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.