CoreWeave Ellendale ND
CoreWeave Ellendale ND is an operational data center that is still expanding, operated by CoreWeave in Ellendale, United States. Its power is about 88 MW, growing to about 520 MW by 2027-06. Epoch AI estimates about 93,000 H100-equivalent AI chips (B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Facility power | 88 MW Reported (Epoch AI or owner data) |
| IT power | 68 MW |
| Planned power | 520 MW by 2027-06-01 Epoch AI timeline projection. |
| AI compute | 93,000 H100-equivalents → 505,000 planned |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 38,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.6 billion → 15.2 billion planned Epoch AI estimate, 2025 USD. |
| Address | 9685 87th Ave SE, Ellendale, ND 58436 |
| Coordinates | 46.01026, -98.56869 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-10-31 | 0 | 0 | Start of construction for the first building, according to [Applied Digital](https://ir.applieddigital.com/news-events/press-releases/detail/75/applied-digital-announces-groundbreaking-of). CoreWeave was not leased yet at this site, but this is the construction start date we're using for relevance. |
| 2025-05-28 | 0 | 0 | CoreWeave signed the first lease package for 250 MW. No buildings online yet. This is according to an [SEC 8-k filing](https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm) from this date. |
| 2025-08-29 | 0 | 0 | [A new 150 MW lease](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with) brings CoreWeave to 400 MW total contracted. The project is now clearly scheduled to be a three-building CoreWeave campus. |
| 2025-10-27 | 65 MW | 69,000 | The first 50 MW slice of Building 1 has reached Ready for Service status according to [this report](https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at). This is the first point where we would count any CoreWeave capacity as operational. |
| 2025-11-24 | 88 MW | 93,000 | [This Applied Digital report](https://ir.applieddigital.com/news-events/press-releases/detail/137/applied-digital-completes-phase-ii-ready-for-service-at) says the rest of Building 1 has reached Ready for Service, bringing the first building to its expected 100 MW. We can treat this as the first completed data center building. |
| 2026-03-27 | 88 MW | 93,000 | According to satellite imagery, Building 1 looks complete and in service, with the surrounding power/cooling equipment also operational. (Note: this image doesn't provide a view of buildings 2 or 3, though it's very safe to assume they're under construction at this stage, considering they're still under construction in the satellite image 3 months from now.) |
| 2026-06-30 | 88 MW | 93,000 | According to satellite imagery, Building 2 is fully roofed and shell complete, with rooftop chillers mostly installed. Building 3 construction is well underway, with about 1/4 of the roofing done and the foundation laid out. |
| 2026-12-31 (projected) | 114 MW | 300,000 | According to the [schedule](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with), Building 2 should be online sometime in the second half of 2026. We can estimate the end of 2026 for 250 MW operational. |
| 2027-06-01 (projected) | 520 MW | 505,000 | According to [schedule](https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with), Building 3 should come online in the first half of 2027. That would bring the full PF1 campus to 400 MW, according to the contract. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-10-27 | B200 | 27,300 | Estimate |
| 2025-11-24 | B200 | 36,900 | Estimate |
| 2026-12-31 | B200 | 118,700 | Estimate |
| 2027-06-01 | B200 | 200,500 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Ellendale ND use?
Public data puts the facility power at about 88 MW, with about 520 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does CoreWeave Ellendale ND use?
Reported chips: B200.
Who operates CoreWeave Ellendale ND?
CoreWeave. Reported users: OpenAI.
Data centers near Ellendale
- ELN02 299 m · 29 MW
- Data center in Aberdeen 428 m · 5.2 MW
- Data center in Aberdeen 457 m · 7.3 MW
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Denton TX United States
- CoreWeave Chester VA United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Norway Norway
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.