CoreWeave Chester VA
CoreWeave Chester VA is an operational data center that is still expanding, operated by CoreWeave in VA, United States. Its power is about 114 MW, growing to about 197 MW by 2027-06. Epoch AI estimates about 88,000 H100-equivalent AI chips (H100, B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Facility power | 114 MW Reported (Epoch AI or owner data) |
| IT power | 82 MW |
| Planned power | 197 MW by 2027-06-30 Epoch AI timeline projection. |
| AI compute | 88,000 H100-equivalents → 126,000 planned |
| AI chips | H100, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 46,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 3.1 billion → 4.3 billion planned Epoch AI estimate, 2025 USD. |
| Address | 1401 Meadowville Technology Parkway, Chester, VA |
| Coordinates | 37.34895, -77.43838 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-09-18 | 0 | 0 | Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/ |
| 2024-01-31 | 25 MW | 15,000 | Building 1's second data hall scheduled to come online this month. |
| 2024-04-30 | 38 MW | 22,000 | Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here. |
| 2025-01-22 | 38 MW | 22,000 | Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there. |
| 2026-05-20 | 114 MW | 88,000 | Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans. |
| 2027-06-30 (projected) | 197 MW | 126,000 | Buildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-01-31 | H100 | 14,800 | Estimate |
| 2024-04-30 | H100 | 22,100 | Estimate |
| 2026-05-20 | B200 | 26,162 | Estimate |
| 2027-06-30 | B200 | 41,012 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Chester VA use?
Public data puts the facility power at about 114 MW, with about 197 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does CoreWeave Chester VA use?
Reported chips: H100, B200.
Who operates CoreWeave Chester VA?
CoreWeave. Reported users: OpenAI.
Data centers near VA
- PowerHouse CTP-03 9.3 km · 54 MW
- Virginia Information Technologies Agency 9.5 km · 23 MW
- Digital Fortress: Richmond 9.9 km · 45 MW
- PowerHouse CTP-02 10.0 km · 15 MW
- PowerHouse CTP-02 10.1 km · 2.3 MW
- RIC3 DC5 21.9 km · 54 MW
- QTS Richmond 3 Data Center 22.0 km · 76 MW
- QTS Richmond 2 22.2 km · 252 MW
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Denton TX United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Norway Norway
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.