PowerHouse CTP-02

PowerHouse CTP-02 is an operational data center operated by PowerHouse in Hopewell, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
OperatorPowerHouse
Facility power15 MW (range 7.7 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,788 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates37.36059, -77.32569

Power and grid

Nearest high-voltage substationEnon Substation, 230 kV, 2.3 km away (Virginia Electric and Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km19
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 7.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.4 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.4 °C (2001 to 2025)
Cooling degree days924 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.27 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does PowerHouse CTP-02 use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

How close is PowerHouse CTP-02 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Enon Substation (230 kV), about 2.3 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for PowerHouse CTP-02?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates PowerHouse CTP-02?

PowerHouse.