CoreWeave Dalton 1 & 2

CoreWeave Dalton 1 & 2 is an operational AI data center operated by CoreWeave in GA, United States. Its power is about 40 MW. Epoch AI estimates about 32,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorCoreWeave
UsersOpenAI (speculative)
Facility power40 MW
Reported (Epoch AI or owner data)
IT power28 MW
AI compute32,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 16,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.1 billion
Epoch AI estimate, 2025 USD.
Address2205 Industrial South Rd, Dalton, GA, 30721
Coordinates34.71344, -84.95215

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 1.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 1.7 km away
HV substations within 10 km24
UtilityDalton Utilities (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 1.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.7 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,062 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m3.9 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-06-0300According to a [few](https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-high-performance-computing-services-capturing-significant-ai-compute-opportunity) [sources](https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm), Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, "The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025."
2025-05-0100Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction. Source: https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf
2025-08-2900Based on Satellite imagery, Dalton 1 is still under construction. The building appears mostly roofed except for the entrance area, and there are no cooling units or backup generators installed yet.
2026-02-2040 MW32,000Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-02-20B30012,750Estimate

Satellite view

Questions

How much power does CoreWeave Dalton 1 & 2 use?

Public data puts the facility power at about 40 MW. Reported (Epoch AI or owner data).

What chips does CoreWeave Dalton 1 & 2 use?

Reported chips: B300.

How close is CoreWeave Dalton 1 & 2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.1 km away. The local utility is Dalton Utilities, in the SOCO balancing area.

How clean is the power for CoreWeave Dalton 1 & 2?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates CoreWeave Dalton 1 & 2?

CoreWeave. Reported users: OpenAI.