CoreWeave Denton TX
CoreWeave Denton TX is an operational data center that is still expanding, operated by CoreWeave in Denton, United States. Its power is about 367 MW, growing to about 395 MW by 2027-05. Epoch AI estimates about 253,000 H100-equivalent AI chips (B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (likely) |
| Facility power | 367 MW Reported (Epoch AI or owner data) |
| IT power | 262 MW |
| Planned power | 395 MW by 2027-05-31 Epoch AI timeline projection. |
| AI compute | 253,000 H100-equivalents → 272,000 planned |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 150,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 9.9 billion → 10.7 billion planned Epoch AI estimate, 2025 USD. |
| Address | 8171 Jim Christal Rd, Denton, TX 76207 |
| Coordinates | 33.21927, -97.17472 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-11-01 | 0 | 0 | Construction start - The [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706) reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center. |
| 2025-05-31 | 11 MW | 7,782 | First 8 MW billable tranche dedicated to AI [starts running at the site](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/q12025corescientificinc-ea.htm), with another 40 scheduled by the end of the quarter. |
| 2025-12-31 | 94 MW | 65,000 | Half the campus energized. 67 billable MW [are now dedicated](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf) to CoreWeave's GPUs across three buildings. |
| 2026-02-23 | 183 MW | 126,000 | Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery. |
| 2026-03-02 | 183 MW | 126,000 | Buildings 1-3 (Denton North) are fully operational running AI (Denton North at 90 MW, Denton South partially running at 41). This is according to an [earnings call](https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/) from this date. |
| 2026-07-03 | 367 MW | 253,000 | Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the [Q2 2026 Earnings call](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf) stating the campus was operational by midyear 2026. |
| 2026-09-01 | 367 MW | 253,000 | Building 8 interior fit-out scheduled to begin. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026. |
| 2027-05-31 (projected) | 395 MW | 272,000 | Building 8 projected operational. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules Building A's data-hall fit-out for completion by this date. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-12-31 | B200 | 16,000 | Estimate |
| 2026-02-23 | B200 | 50,000 | Reported |
| 2026-07-03 | B200 | 100,000 | Estimate |
| 2027-05-31 | B200 | 107,634 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Denton TX use?
Public data puts the facility power at about 367 MW, with about 395 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does CoreWeave Denton TX use?
Reported chips: B200.
Who operates CoreWeave Denton TX?
CoreWeave. Reported users: OpenAI.
Data centers near Denton
- CITIGROUP TECHNOLOGY INC 24.6 km · 21 MW
- Charles Schwab Data Center 24.8 km · 7 MW
- Facebook Fort Worth Datacenter 26.8 km · 153 MW
- QTS Fort Worth (FTW1) 26.8 km
- QTS Data Center 26.8 km · 37 MW
- Facebook Fort Worth Datacenter 27.1 km · 88 MW
- Facebook Fort Worth Datacenter 27.3 km · 163 MW
- Verizon Wireless Mew Building 27.5 km · 38 MW
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Chester VA United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Norway Norway
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.