CoreWeave Norway is an operational AI data center operated by CoreWeave in Vennesla, Norway. Its power is about 55 MW. Epoch AI estimates about 51,000 H100-equivalent AI chips (B200).

Key facts

StatusOperational
OperatorCoreWeave
UsersOpenAI (speculative)
Facility power55 MW
Reported (Epoch AI or owner data)
IT power42 MW
AI compute51,000 H100-equivalents
AI chipsB200
Reported (Epoch AI or owner data)
Chip count2,048
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.6 billion
Epoch AI estimate, 2025 USD.
Also known asBulk N01 Campus
AddressStølevegen 39, 4715 Øvrebø, Norway
Coordinates58.25757, 7.89205

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 100 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 420 kV, 500 m away
HV substations within 10 km8
Power plants within 50 km568 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity28 g CO₂ per kWh (Norway, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99%
Industrial power priceEUR 0.097 per kWh (Norway, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature29.4 °C (2001 to 2025)
Cooling degree days8 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.76 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow (<10%) (Norway)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-01-2300[This article](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand) from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here.
2025-07-2755 MW51,000Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, [Bulk](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure) said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave.
2026-04-2555 MW51,000Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image.
2026-08-1555 MW51,000Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. [Bulk](https://bulkinfrastructure.com/newsroom/bulk-infrastructure-secures-410-million-for-n01-data-center-campus-expansion) is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-07-27B20020,096Estimate

GPU clusters at this site

ClusterChipsCountPowerSince
Northern Data Group Taiga Cloud NO1 Island 2NVIDIA H100 SXM5 80GB2,0482.9 MW2024-03-30
Northern Data Group Taiga Cloud NO1 Island 1NVIDIA H100 SXM5 80GB2,0482.9 MW2024-03-30

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does CoreWeave Norway use?

Public data puts the facility power at about 55 MW. Reported (Epoch AI or owner data).

What chips does CoreWeave Norway use?

Reported chips: B200.

How close is CoreWeave Norway to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 100 m away.

How clean is the power for CoreWeave Norway?

The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.

Who operates CoreWeave Norway?

CoreWeave. Reported users: OpenAI.

Data centers near Vennesla

More CoreWeave data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.