CoreWeave Norway
CoreWeave Norway is an operational AI data center operated by CoreWeave in Vennesla, Norway. Its power is about 55 MW. Epoch AI estimates about 51,000 H100-equivalent AI chips (B200).
Key facts
| Status | Operational |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Facility power | 55 MW Reported (Epoch AI or owner data) |
| IT power | 42 MW |
| AI compute | 51,000 H100-equivalents |
| AI chips | B200 Reported (Epoch AI or owner data) |
| Chip count | 2,048 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.6 billion Epoch AI estimate, 2025 USD. |
| Also known as | Bulk N01 Campus |
| Address | Stølevegen 39, 4715 Øvrebø, Norway |
| Coordinates | 58.25757, 7.89205 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 420 kV, 500 m away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 568 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 28 g CO₂ per kWh (Norway, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99% |
| Industrial power price | EUR 0.097 per kWh (Norway, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.4 °C (2001 to 2025) |
| Cooling degree days | 8 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.76 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low (<10%) (Norway) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-01-23 | 0 | 0 | [This article](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand) from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here. |
| 2025-07-27 | 55 MW | 51,000 | Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, [Bulk](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure) said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave. |
| 2026-04-25 | 55 MW | 51,000 | Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image. |
| 2026-08-15 | 55 MW | 51,000 | Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. [Bulk](https://bulkinfrastructure.com/newsroom/bulk-infrastructure-secures-410-million-for-n01-data-center-campus-expansion) is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-07-27 | B200 | 20,096 | Estimate |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Northern Data Group Taiga Cloud NO1 Island 2 | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2024-03-30 |
| Northern Data Group Taiga Cloud NO1 Island 1 | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2024-03-30 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Norway use?
Public data puts the facility power at about 55 MW. Reported (Epoch AI or owner data).
What chips does CoreWeave Norway use?
Reported chips: B200.
How close is CoreWeave Norway to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 100 m away.
How clean is the power for CoreWeave Norway?
The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.
Who operates CoreWeave Norway?
CoreWeave. Reported users: OpenAI.
Data centers near Vennesla
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Denton TX United States
- CoreWeave Chester VA United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.