CoreWeave Muskogee OK

CoreWeave Muskogee OK is a data center under construction operated by CoreWeave in Muskogee, United States. No power figure is public for this site yet. Likely chips: B300.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorCoreWeave
UsersOpenAI (speculative)
Planned power181 MW by 2027-12-31
Epoch AI timeline projection.
AI chipsB300
Reported (Epoch AI or owner data)
Address1525 W 43rd St S, Muskogee, OK 74401, USA
Coordinates35.69692, -95.38427

Power and grid

UtilityEast Central Oklahoma Elec Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityAECI
Nearest gas pipelineEnogex Inc, intrastate pipeline, 3.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity343 g CO₂ per kWh (Oklahoma, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1%
Industrial power priceUSD 0.082 per kWh (Oklahoma, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature46.9 °C (2001 to 2025)
Cooling degree days1,189 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.5 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (Oklahoma)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-11-1800Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific [says](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center) the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs.
2026-04-0900Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning. Not much progress has happened in the past 4 months, and a Q2 2026 finish seems unlikely.
2026-06-1300Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators. We can assume Building 1 is not operational from all the yard work directly surrounding it, and the lack of a parking lot. Building 2 (The one not leased to CoreWeave) is still in land clearing phase.
2026-12-31 (projected)98 MW91,000Estimating building 1 is operational by the end of the year, judging from the building currently completed, the completed power substation to the southwest. The surrounding yard work/construction will likely still take several months, judging from the slow pace.
2027-12-31 (projected)181 MW198,000Core Scientific expects initial delivery of the second, unleased 82.5 MW Muskogee building in Q4 2027. Not signed to have CoreWeave GPUs as of yet, but may change in the future. Source: https://www.sec.gov/Archives/edgar/data/1839341/000162828026030918/exhibit991polarispressre.htm

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-12-31B30036,000Estimate

Satellite view

Questions

What chips does CoreWeave Muskogee OK use?

Reported chips: B300.

How clean is the power for CoreWeave Muskogee OK?

The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.

Who operates CoreWeave Muskogee OK?

CoreWeave. Reported users: OpenAI.

Data centers near Muskogee

More CoreWeave data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.