CoreWeave Muskogee OK
CoreWeave Muskogee OK is a data center under construction operated by CoreWeave in Muskogee, United States. No power figure is public for this site yet. Likely chips: B300.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Planned power | 181 MW by 2027-12-31 Epoch AI timeline projection. |
| AI chips | B300 Reported (Epoch AI or owner data) |
| Address | 1525 W 43rd St S, Muskogee, OK 74401, USA |
| Coordinates | 35.69692, -95.38427 |
Power and grid
| Utility | East Central Oklahoma Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AECI |
| Nearest gas pipeline | Enogex Inc, intrastate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 46.9 °C (2001 to 2025) |
| Cooling degree days | 1,189 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.5 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-11-18 | 0 | 0 | Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific [says](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center) the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs. |
| 2026-04-09 | 0 | 0 | Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning. Not much progress has happened in the past 4 months, and a Q2 2026 finish seems unlikely. |
| 2026-06-13 | 0 | 0 | Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators. We can assume Building 1 is not operational from all the yard work directly surrounding it, and the lack of a parking lot. Building 2 (The one not leased to CoreWeave) is still in land clearing phase. |
| 2026-12-31 (projected) | 98 MW | 91,000 | Estimating building 1 is operational by the end of the year, judging from the building currently completed, the completed power substation to the southwest. The surrounding yard work/construction will likely still take several months, judging from the slow pace. |
| 2027-12-31 (projected) | 181 MW | 198,000 | Core Scientific expects initial delivery of the second, unleased 82.5 MW Muskogee building in Q4 2027. Not signed to have CoreWeave GPUs as of yet, but may change in the future. Source: https://www.sec.gov/Archives/edgar/data/1839341/000162828026030918/exhibit991polarispressre.htm |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-12-31 | B300 | 36,000 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does CoreWeave Muskogee OK use?
Reported chips: B300.
How clean is the power for CoreWeave Muskogee OK?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Who operates CoreWeave Muskogee OK?
CoreWeave. Reported users: OpenAI.
Data centers near Muskogee
- Data center in Muskogee 18.4 km · 9.8 MW
- Lake Region Technology & Communications 34.4 km
- Data center in Tulsa 60.1 km · 0.7 MW
- TierPoint Tulsa-State Farm 60.5 km
- TulsaConnect DC3 60.6 km
- TulsaConnect DC3 60.6 km
- Google Pryor (North) 60.7 km · 442 MW
- Jackson Technical Datacenter 74.0 km
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Denton TX United States
- CoreWeave Chester VA United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Norway Norway
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.