Data Center Directory

CoreWeave Lancaster Greenfield site

CoreWeave Lancaster Greenfield site is a data center under construction operated by CoreWeave in PA, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorCoreWeave
UsersOpenAI (speculative)
Planned power124 MW by 2027-06-30
Epoch AI timeline projection.
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
InvestorsBlue Owl Capital
Address216 Greenfield Rd, Lancaster, PA
Coordinates40.04722, -76.25553

Power and grid

Nearest high-voltage substationNorth Bridgeport Substation, 138 kV, 100 m away (PPL)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSouth Akron Substation, 230 kV, 11.3 km away
HV substations within 10 km15
UtilityPpl Electric Utilities Corp (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 1.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km12 GW in 32 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity387 g CO₂ per kWh (Pennsylvania, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3%
Industrial power priceUSD 0.105 per kWh (Pennsylvania, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.2 °C (2001 to 2025)
Cooling degree days578 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow - Medium (10-20%) (Pennsylvania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-07-1500[Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.](https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx)
2026-07-1300Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.
2027-06-30 (projected)124 MW233,000[We estimate that Building 1 will be operational by Summer 2027 due to third party reporting.](https://www.witf.org/2025/08/28/lancaster-city-data-centers-face-zoning-hearing-possible-new-regulations/)

Source: Epoch AI Frontier Data Centers.

Satellite view

Questions

What chips does CoreWeave Lancaster Greenfield site use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

How close is CoreWeave Lancaster Greenfield site to the power grid?

The nearest high-voltage substation in OpenStreetMap is North Bridgeport Substation (138 kV), about 100 m away. The local utility is Ppl Electric Utilities Corp, in the PJM balancing area.

How clean is the power for CoreWeave Lancaster Greenfield site?

The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.

Who operates CoreWeave Lancaster Greenfield site?

CoreWeave. Reported users: OpenAI.

Data centers near PA

More CoreWeave data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.