Data center in Muskogee
Data center in Muskogee is an operational data center in Muskogee, United States. Our footprint estimate of its power is about 9.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.8 MW (range 4.9 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,134 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.56813, -95.51242 |
Power and grid
| Utility | East Central Oklahoma Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AECI |
| Nearest gas pipeline | TransOk Pipeline Co, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 343 g CO₂ per kWh (Oklahoma, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 44.6%, wind 41.7%, coal 10.3%, hydro 1.9%, solar 1.1%. Clean power: 45.1% |
| Industrial power price | USD 0.082 per kWh (Oklahoma, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 46.9 °C (2001 to 2025) |
| Cooling degree days | 1,189 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.5 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oklahoma) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Muskogee use?
We estimate the facility power at about 9.8 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Muskogee?
The grid in Oklahoma emits about 343 g CO₂ per kWh (2025). Largest sources: gas 44.6%, wind 41.7%, coal 10.3%.
Data centers near Muskogee
- CoreWeave Muskogee OK 18.4 km
- Lake Region Technology & Communications 52.8 km
- Data center in Tulsa 64.8 km · 0.7 MW
- TierPoint Tulsa-State Farm 65.8 km
- TulsaConnect DC3 65.9 km
- TulsaConnect DC3 66.0 km
- Google Pryor (North) 76.6 km · 442 MW
- TulsaConnect 77.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.