Facebook Fort Worth Datacenter
Facebook Fort Worth Datacenter is an operational data center operated by Meta in Roanoke, United States. Our footprint estimate of its power is about 163 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 163 MW (range 81 MW to 261 MW) Estimate from building footprint, low confidence. Footprint estimate: about 135,748 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 70,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Like Way 4500 |
| Coordinates | 32.98378, -97.25933 |
Power and grid
| Nearest high-voltage substation | Facebook Data Center, 138 kV, 300 m away (Oncor) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Roanoke Substation, 345 kV, 900 m away |
| HV substations within 10 km | 18 |
| Utility | Denton County Elec Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Energy Transfer, intrastate pipeline, 8.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.4 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.7 °C (2001 to 2025) |
| Cooling degree days | 1,585 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Facebook Fort Worth Datacenter use?
We estimate the facility power at about 163 MW. Estimate from building footprint, low confidence.
What chips does Facebook Fort Worth Datacenter use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Facebook Fort Worth Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is Facebook Data Center (138 kV), about 300 m away. The local utility is Denton County Elec Coop, INC, in the ERCO balancing area.
How clean is the power for Facebook Fort Worth Datacenter?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Facebook Fort Worth Datacenter?
Meta.
Data centers near Roanoke
- Facebook Fort Worth Datacenter 420 m · 88 MW
- QTS Fort Worth (FTW1) 557 m
- QTS Data Center 570 m · 37 MW
- Facebook Fort Worth Datacenter 640 m · 153 MW
- TierPoint Dallas Forth Worth 800 m
- Charles Schwab Data Center 2.6 km · 7 MW
- CITIGROUP TECHNOLOGY INC 2.8 km · 21 MW
- Verizon Wireless Mew Building 9.7 km · 38 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States