DC BLOX CHA1 - DCBLOX Chattanooga is an operational data center operated by DC BLOX Parent in Chattanooga, United States. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorDC BLOX Parent
Facility power1.4 MW (range 0.7 MW to 2.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,129 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks
PeeringDB.
Also known asDC Blox Chattanooga
Address807 E 16th St,
Coordinates35.03158, -85.29726
Websitedcblox.com/data-centers/chattanooga

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 2.6 km away (Electric Power Board of Chattanooga)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 500 kV, 8.7 km away
HV substations within 10 km8
UtilityCity Of Chattanooga (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineEast Tennessee Gas Co, interstate pipeline, 6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.6 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days865 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DC BLOX CHA1 - DCBLOX Chattanooga use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is DC BLOX CHA1 - DCBLOX Chattanooga to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 2.6 km away. The local utility is City Of Chattanooga, in the TVA balancing area.

How clean is the power for DC BLOX CHA1 - DCBLOX Chattanooga?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Who operates DC BLOX CHA1 - DCBLOX Chattanooga?

DC BLOX Parent.

Data centers near Chattanooga

More DC BLOX Parent data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.