Google Jackson County Data Center is an operational data center operated by Google in Scottsboro, United States. Our footprint estimate of its power is about 90 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
OperatorGoogle
Facility power90 MW (range 36 MW to 225 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 750,351 m² site outline x 0.12 kW per m² of land.
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 38,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asGoogle
Opened2018
Coordinates34.91466, -85.74837
Websitegoogle.com/about/datacenters/locations/jackson-county

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 100 m away (Google LLC)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWidows Creek Substation, 500 kV, 3.2 km away
HV substations within 10 km11
UtilityNorth Alabama Electric Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineUSG Pipeline Co, interstate pipeline, 6.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.8 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity399 g CO₂ per kWh (Alabama, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 30%, coal 15.2%, hydro 5.8%, bioenergy 2.3%. Clean power: 39.1%
Industrial power priceUSD 0.081 per kWh (Alabama, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days865 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow - Medium (10-20%) (Alabama)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Google Jackson County Data Center use?

We estimate the facility power at about 90 MW. Estimate from building footprint, low confidence.

What chips does Google Jackson County Data Center use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How close is Google Jackson County Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 100 m away. The local utility is North Alabama Electric Coop, in the TVA balancing area.

How clean is the power for Google Jackson County Data Center?

The grid in Alabama emits about 399 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 30%, coal 15.2%.

Who operates Google Jackson County Data Center?

Google.

Data centers near Scottsboro

More Google data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.