Estación de amarre cable submarino de fibra óptica
Estación de amarre cable submarino de fibra óptica is an operational data center operated by Cirion Technologies in Santa Teresita, Argentina. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cirion Technologies |
| Facility power | 0.7 MW (range 0.3 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,051 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Calle 31 1049 |
| Coordinates | -36.48727, -56.71015 |
Power and grid
| Power plants within 50 km | 30 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
|---|---|
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 15.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.4 °C (2001 to 2025) |
| Cooling degree days | 333 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.55 kWh per m² per day |
| Wind at 50 m | 7.7 m/s average |
| Water stress today | Low (<10%) (Buenos Aires) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Estación de amarre cable submarino de fibra óptica use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Estación de amarre cable submarino de fibra óptica?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates Estación de amarre cable submarino de fibra óptica?
Cirion Technologies.
Data centers near Santa Teresita
More Cirion Technologies data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.