Data Center Directory

Cirion Technologies data center in Granadero Baigorria

Cirion Technologies data center in Granadero Baigorria is an operational data center operated by Cirion Technologies in Granadero Baigorria, Argentina. Our footprint estimate of its power is about 1.1 MW.

Key facts

StatusOperational
OperatorCirion Technologies
Facility power1.1 MW (range 0.5 MW to 1.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 875 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-32.91041, -60.72530

Power and grid

Nearest high-voltage substationEstación Transformadora Ciudad Industria, 132 kV, 5.7 km away (Empresa Proveedora de Energía de Santa Fe)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEstación Transformadora Rosario Oeste, 500 kV, 8.2 km away
HV substations within 10 km3
Power plants within 50 km2.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Average temperature18 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43 °C (2001 to 2025)
Cooling degree days965 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayLow (<10%) (Santa Fe)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cirion Technologies data center in Granadero Baigorria use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

How close is Cirion Technologies data center in Granadero Baigorria to the power grid?

The nearest high-voltage substation in OpenStreetMap is Estación Transformadora Ciudad Industria (132 kV), about 5.7 km away.

How clean is the power for Cirion Technologies data center in Granadero Baigorria?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.

Who operates Cirion Technologies data center in Granadero Baigorria?

Cirion Technologies.

Data centers near Granadero Baigorria

More Cirion Technologies data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.