Cirion Technologies data center in Granadero Baigorria
Cirion Technologies data center in Granadero Baigorria is an operational data center operated by Cirion Technologies in Granadero Baigorria, Argentina. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cirion Technologies |
| Facility power | 1.1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 875 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -32.91041, -60.72530 |
Power and grid
| Nearest high-voltage substation | Estación Transformadora Ciudad Industria, 132 kV, 5.7 km away (Empresa Proveedora de Energía de Santa Fe) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Estación Transformadora Rosario Oeste, 500 kV, 8.2 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 2.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 965 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low (<10%) (Santa Fe) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cirion Technologies data center in Granadero Baigorria use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is Cirion Technologies data center in Granadero Baigorria to the power grid?
The nearest high-voltage substation in OpenStreetMap is Estación Transformadora Ciudad Industria (132 kV), about 5.7 km away.
How clean is the power for Cirion Technologies data center in Granadero Baigorria?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates Cirion Technologies data center in Granadero Baigorria?
Cirion Technologies.
Data centers near Granadero Baigorria
- Cabase ROS 8.6 km
- Nubenet 8.8 km
- DataCenter TelVGG 9.0 km
- Cirion Rosario - ROS1 11.6 km
- DATALINK SRL 54.3 km
- G2K HOSTING DATACENTER 66.0 km
More Cirion Technologies data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.