Cirion Rosario - ROS1
Cirion Rosario - ROS1 is an operational data center operated by Cirion in Rosario, Argentina. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cirion |
| Networks | 2 networks PeeringDB. |
| Address | Av. Circunvalacion 25 de Mayo 1545 bis (entre Martinez Estrada y Sorrento |
| Coordinates | -32.96753, -60.62083 |
| Website | ciriontechnologies.com/es-ar/data-centers |
Power and grid
| Nearest high-voltage substation | Estación Transformadora Rosario Sur, 132 kV, 6.3 km away (Empresa Provincial de la Energía de Santa Fe) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Estación Transformadora Rosario Oeste, 500 kV, 14.8 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 2.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 965 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low (<10%) (Santa Fe) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cirion Rosario - ROS1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Estación Transformadora Rosario Sur (132 kV), about 6.3 km away.
How clean is the power for Cirion Rosario - ROS1?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Who operates Cirion Rosario - ROS1?
Cirion.
Data centers near Rosario
- DataCenter TelVGG 2.8 km
- Nubenet 2.8 km
- Cabase ROS 3.2 km
- Cirion Technologies data center in Granadero Baigorria 11.6 km · 1.1 MW
- G2K HOSTING DATACENTER 54.6 km
- DATALINK SRL 65.8 km
More Cirion data centers
- Cirion Bogota - BOG1 Colombia
- Cirion Buenos Aires - BUE1 Argentina
- Cirion Santiago de Chile - SAN1 Chile
- Cirion Bogota - BOG2 Colombia
- Cirion Cordoba - COR1 Argentina
- Cirion Curitiba - CUR1 Brazil
- Cirion Fortaleza Brazil
- Cirion La Urbina Venezuela
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.