EVRY AS Gjøvik
EVRY AS Gjøvik is an operational data center operated by EVRY Datacenter Gjøvik in Gjøvik, Norway. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EVRY Datacenter Gjøvik |
| Networks | 2 networks PeeringDB. |
| Address | Hans Mustads gate 31 |
| Coordinates | 60.79215, 10.68157 |
| Website | evry.com |
Power and grid
| Grid carbon intensity | 28 g CO₂ per kWh (Norway, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99% |
| Industrial power price | EUR 0.097 per kWh (Norway, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 2.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30 °C (2001 to 2025) |
| Cooling degree days | 8 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.51 kWh per m² per day |
| Wind at 50 m | 3.7 m/s average |
| Water stress today | Low (<10%) (Norway) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for EVRY AS Gjøvik?
The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.
Who operates EVRY AS Gjøvik?
EVRY Datacenter Gjøvik.
Data centers near Gjøvik
- Nordavind Rudshøgda Sør 14.8 km
- Nordavind Krabyskogen 18.5 km
- Innit Hamar 20.6 km
- Green Mountain Innlandet 32.1 km · 28 MW
- NexGen Cloud Hyperstack AQ Compute Supercomputer 69.7 km · 23 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.