Nordavind Krabyskogen is an operational data center operated by Nordavind DC Sites in Lena, Norway. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNordavind DC Sites
AddressKrabyskogen
Coordinates60.65461, 10.87349
Websitenordavind.com/dcsites/krabyskogen

Power and grid

Nearest high-voltage substationKrabyskogen trafo, 132 kV, 400 m away (Elvia)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationVardal trafostasjon, 300 kV, 23.4 km away
HV substations within 10 km2
Power plants within 50 km59 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity28 g CO₂ per kWh (Norway, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99%
Industrial power priceEUR 0.097 per kWh (Norway, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature3.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31 °C (2001 to 2025)
Cooling degree days15 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.55 kWh per m² per day
Wind at 50 m3.6 m/s average
Water stress todayLow (<10%) (Norway)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Nordavind Krabyskogen to the power grid?

The nearest high-voltage substation in OpenStreetMap is Krabyskogen trafo (132 kV), about 400 m away.

How clean is the power for Nordavind Krabyskogen?

The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.

Who operates Nordavind Krabyskogen?

Nordavind DC Sites.

Data centers near Lena

More Nordavind DC Sites data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.