Nordavind Grundsetmoen is an operational data center operated by Nordavind DC Sites in Elverum, Norway. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Nordavind DC Sites |
| Address | Grundsetmoen |
| Coordinates | 60.90731, 11.51444 |
| Website | nordavind.com/dcsites/grundsetmoen |
Power and grid
| Nearest high-voltage substation | Elverum trafostasjon, 132 kV, 1.6 km away (Elvia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Vang trafostasjon, 300 kV, 15.5 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 212 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 28 g CO₂ per kWh (Norway, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99% |
| Industrial power price | EUR 0.097 per kWh (Norway, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 2.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.6 °C (2001 to 2025) |
| Cooling degree days | 12 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.51 kWh per m² per day |
| Wind at 50 m | 3.7 m/s average |
| Water stress today | Low (<10%) (Norway) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Nordavind Grundsetmoen to the power grid?
The nearest high-voltage substation in OpenStreetMap is Elverum trafostasjon (132 kV), about 1.6 km away.
How clean is the power for Nordavind Grundsetmoen?
The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.
Who operates Nordavind Grundsetmoen?
Nordavind DC Sites.
Data centers near Elverum
- Nordavind Hagen 9.8 km
- Green Mountain Innlandet 15.3 km · 28 MW
- Innit Hamar 27.6 km
- Nordavind Grue Industry Park 58.8 km
- Nodavind Slomarka 73.9 km
- Nordavind Tronbøl 75.2 km
More Nordavind DC Sites data centers
- Nodavind Slomarka Norway
- Nordavind Åkrestrømmen Norway
- Nordavind Grue Industry Park Norway
- Nordavind Hagen Norway
- Nordavind Krabyskogen Norway
- Nordavind Lalm Norway
- Nordavind Plassen Norway
- Nordavind Rudshøgda Sør Norway
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.