Nordavind Tronbøl
Nordavind Tronbøl is an operational data center operated by Nordavind DC Sites in Skarnes, Norway. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Nordavind DC Sites |
| Address | Disenåvegen |
| Coordinates | 60.23539, 11.67572 |
| Website | nordavind.com/dcsites/tronbol |
Power and grid
| Nearest high-voltage substation | Skarnes trafostasjon, 132 kV, 1 km away (Elvia;Statnett) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Minne transformatorstasjon, 300 kV, 29.8 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 122 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 28 g CO₂ per kWh (Norway, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 89.9%, wind 8.4%, gas 0.6%. Clean power: 99% |
| Industrial power price | EUR 0.097 per kWh (Norway, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.1 °C (2001 to 2025) |
| Cooling degree days | 22 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.55 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Low (<10%) (Norway) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Nordavind Tronbøl to the power grid?
The nearest high-voltage substation in OpenStreetMap is Skarnes trafostasjon (132 kV), about 1 km away.
How clean is the power for Nordavind Tronbøl?
The grid in Norway emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 89.9%, wind 8.4%, gas 0.6%.
Who operates Nordavind Tronbøl?
Nordavind DC Sites.
Data centers near Skarnes
- Nodavind Slomarka 3.9 km
- Nordavind Grue Industry Park 32.5 km
- STACK EMEA - OSL03 43.3 km
- Nordavind Hagen 66.3 km
- Innit Hamar 70.7 km
- Green Mountain Innlandet 71.0 km · 28 MW
- Nordavind Grundsetmoen 75.2 km
- STACK Infrastructure OSL04 76.7 km · 4 MW
More Nordavind DC Sites data centers
- Nodavind Slomarka Norway
- Nordavind Åkrestrømmen Norway
- Nordavind Grue Industry Park Norway
- Nordavind Grundsetmoen Norway
- Nordavind Hagen Norway
- Nordavind Krabyskogen Norway
- Nordavind Lalm Norway
- Nordavind Plassen Norway