Fitjar Campus
Fitjar Campus is an operational data center operated by Borealis Data Center in Reykjanesbær, Iceland. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Borealis Data Center |
| Facility power | 1.1 MW (range 0.6 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 952 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Vogshóll 10 |
| Opened | 2019 |
| Coordinates | 63.96200, -22.53500 |
| Website | bdc.is/sites/fitjar-campus |
Power and grid
| Nearest high-voltage substation | Fitjar, 132 kV, 900 m away (Landsnet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Njarðvíkurheiði, 220 kV, 2.2 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 225 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 28 g CO₂ per kWh (Iceland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 71.2%, other renewables 28.7%. Clean power: 100% |
| Industrial power price | EUR 0.090 per kWh (Iceland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 21.3 °C (2001 to 2025) |
| Cooling degree days | 0 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.2 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low (<10%) (Iceland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fitjar Campus use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is Fitjar Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Fitjar (132 kV), about 900 m away.
How clean is the power for Fitjar Campus?
The grid in Iceland emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 71.2%, other renewables 28.7%.
Who operates Fitjar Campus?
Borealis Data Center.
Data centers near Reykjanesbær
- ICE02 Campus 250 m · 8.3 MW
- Opera Iceland KEF-1 SuperPOD 332 m · 0.4 MW
- Nscale Keflavik 2.6 km · 6.6 MW
- Verne Iceland 2.6 km
- Verne Gagnaver 2.7 km · 11 MW
- Þjóðbraut 838 2.9 km · 1.4 MW
- DataCell Keflavik 1 4.8 km
More Borealis Data Center data centers
- Blönduós Campus Iceland
- Borealis Data Center Iceland
- Kajaani Campus Iceland
- Reykjavík Campus Iceland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.