Data Center Directory

Verne Gagnaver

Verne Gagnaver is an operational data center operated by Verne Global in Reykjanesbær, Iceland. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorVerne Global
Facility power11 MW (range 5.6 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,391 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressValhallarbraut 869, 262
Opened1954
Coordinates63.97785, -22.57582
Websiteverneglobal.com

Power and grid

Nearest high-voltage substationFitjar, 132 kV, 1.9 km away (Landsnet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNjarðvíkurheiði, 220 kV, 4.9 km away
HV substations within 10 km4
Power plants within 50 km225 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity28 g CO₂ per kWh (Iceland, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 71.2%, other renewables 28.7%. Clean power: 100%
Industrial power priceEUR 0.090 per kWh (Iceland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature21.3 °C (2001 to 2025)
Cooling degree days0 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.2 kWh per m² per day
Wind at 50 m7.8 m/s average
Water stress todayLow (<10%) (Iceland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Verne Gagnaver use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Verne Gagnaver to the power grid?

The nearest high-voltage substation in OpenStreetMap is Fitjar (132 kV), about 1.9 km away.

How clean is the power for Verne Gagnaver?

The grid in Iceland emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 71.2%, other renewables 28.7%.

Who operates Verne Gagnaver?

Verne Global.

Data centers near Reykjanesbær

More Verne Global data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.