Verne Gagnaver
Verne Gagnaver is an operational data center operated by Verne Global in Reykjanesbær, Iceland. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Verne Global |
| Facility power | 11 MW (range 5.6 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,391 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Valhallarbraut 869, 262 |
| Opened | 1954 |
| Coordinates | 63.97785, -22.57582 |
| Website | verneglobal.com |
Power and grid
| Nearest high-voltage substation | Fitjar, 132 kV, 1.9 km away (Landsnet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Njarðvíkurheiði, 220 kV, 4.9 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 225 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 28 g CO₂ per kWh (Iceland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 71.2%, other renewables 28.7%. Clean power: 100% |
| Industrial power price | EUR 0.090 per kWh (Iceland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 21.3 °C (2001 to 2025) |
| Cooling degree days | 0 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.2 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low (<10%) (Iceland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Verne Gagnaver use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Verne Gagnaver to the power grid?
The nearest high-voltage substation in OpenStreetMap is Fitjar (132 kV), about 1.9 km away.
How clean is the power for Verne Gagnaver?
The grid in Iceland emits about 28 g CO₂ per kWh (2025). Largest sources: hydro 71.2%, other renewables 28.7%.
Who operates Verne Gagnaver?
Verne Global.
Data centers near Reykjanesbær
- Nscale Keflavik 97 m · 6.6 MW
- Þjóðbraut 838 424 m · 1.4 MW
- Verne Iceland 752 m
- Opera Iceland KEF-1 SuperPOD 2.3 km · 0.4 MW
- ICE02 Campus 2.4 km · 8.3 MW
- Fitjar Campus 2.7 km · 1.1 MW
- DataCell Keflavik 1 3.0 km
More Verne Global data centers
- Verne Helsinki Finland
- Verne Iceland Iceland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.