Fort Rock Data Center

Fort Rock Data Center is an operational data center operated by Fort Rock Data Center in Bend, United States. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
OperatorFort Rock Data Center
Facility power0.9 MW (range 0.5 MW to 1.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 788 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks11 networks, 1 internet exchanges
PeeringDB.
Also known asFort Rock DC
Address207 SW Columbia St
Coordinates44.04740, -121.32854
Websitefortrockdc.com

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 23.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 26.5 km away
UtilityBonneville Power Administration (federal)
Electric retail service territory (HIFLD, US government).
Balancing authorityBPAT
Nearest gas pipelineGas Transmission - Northwest, interstate pipeline, 6.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km222 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature7.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days125 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.27 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Fort Rock Data Center use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is Fort Rock Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 23.7 km away. The local utility is Bonneville Power Administration, in the BPAT balancing area.

How clean is the power for Fort Rock Data Center?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates Fort Rock Data Center?

Fort Rock Data Center.